Component 1: Formulation of the SAP
Development of the SAP is the core task to be
completed by the Technical Units in close consultation with UNEP and the
GS/OAS pursuant to the implementation arrangements set forth in paragraph
45 and following. The outcome of the SAP can not be determined a priori,
however, strategic actions were anticipated based upon the findings of the
information previously gathered during the PDF-B phase of the program and
that derived from the TDA. Components 2 through 7 will provide the
knowledge base upon which the SAP will be formulated. Thus, the Technical
Units will
-
assemble the results of the work of components 2 through
7--the cost assessments and feasibility studies conducted at specific
locations within the SJRB over the 36-month project period--,
-
collate
and integrate these outputs with the information previously assembled
during the PDF-B phase of the program using as well information deriving
from the TDA, and
-
synthesize a strategic program of action to
implement specific management measures within the San Juan River Basin
following the completion of this project. Integrated management entails
the coordinated management of land and water resources at the local or
community level within the context of the cumulative impacts and effects
of those actions on the basin as a whole, including the coastal zone.
Specific detailed Terms of Reference will be prepared
by the Technical Units in close consultation with UNEP and GS/OAS, during
the first quarter of the project period.
|